Project for Terna in Agnosine (BS) and Davagna (GE)

Project for Terna in Agnosine (BS) and Davagna (GE)

requirements

Construction of high voltage power lines and trellis installation for Terna.

The project included

  • Excavations
  • Earth moving works
  • Micropiles
  • Assembling the base of the new trellis
  • Reinforced concrete constructions

Standard or extreme operational mode

Extreme

Duration of the work

6 months

Challenges

The mountain site is inaccessible

Solutions

We planned the allocation of our resources so as to handle the different phases and works involved in the construction of a power line as well as the preparatory works, in order to deliver according to the requested timeline and in complete autonomy.

Noteworthy technical details

We operated autonomously across 5 different sites at the same time thanks to our internal structure that allowed us to allocate the necessary number of resources to the project, both in terms of people, machinery and vehicles, ensuring the timely delivery of the project.

Do you have an ambitious project?

Power lines in Austria for APG

Power lines in Austria for APG

requirements

Since 2021, we have been working on the construction of an important 380kV power line on the Alps of Salzburg. As per the project designed by APG (Austrian Power Grid), the work is to be completed in 2024. 

The project included

  • Excavations
  • Reinforced concrete constructions
  • Soil nailing
  • Spritz beton
  • Micropiles
  • Self-drilling bars

Standard or extreme operational mode

Exstreme

Duration of the work

3 years

Challenges

The mountain site is inaccessible.

Solutions

To handle the logistic and transportation challenges and reach the construction site we make use of special machinery that can be dissembled and transported via helicopter.

Noteworthy technical details

The operations in question are complex and require professionalism and precision. We installed satellite instruments on our operating machinery.